Name | Type | Description |
ProductDescription |
P_SINGLEVALUE
/
IfcText
|
| Product Description | A textual description of the products that require the work. |
|
WorkTypeRequested |
P_SINGLEVALUE
/
IfcText
|
| Work Type Requested | Work type requested in circumstances where there are categorizations of types of work task. It could be used to identify a remedial task, minor work task, electrical task etc. |
|
ContractualType |
P_SINGLEVALUE
/
IfcText
|
| Contractual Type | The contractual type of the work. |
|
IfNotAccomplished |
P_SINGLEVALUE
/
IfcText
|
| If Not Accomplished | Comments if the job is not accomplished. |
|
MaintenaceType |
P_ENUMERATEDVALUE
/
IfcLabel
/
PEnum_MaintenanceType |
| Maintenace Type | Identifies the predefined types of maintenance that can be done from which the type that generates the maintenance work order may be set where:
ConditionBased: generated as a result of the condition of an asset or artefact being less than a determined value.
Corrective: generated as a result of an immediate and urgent need for maintenance action.
PlannedCorrective: generated as a result of immediate corrective action being needed but with sufficient time available for the work order to be included in maintenance planning.
Scheduled: generated as a result of a fixed, periodic maintenance requirement. |
|
FaultPriorityType |
P_ENUMERATEDVALUE
/
IfcLabel
/
PEnum_PriorityType |
| Fault Priority Type | Identifies the predefined types of priority that can be assigned from which the type may be set where:
High: action is required urgently.
Medium: action can occur within a reasonable period of time.
Low: action can occur when convenient. |
|
LocationPriorityType |
P_ENUMERATEDVALUE
/
IfcLabel
/
PEnum_PriorityType |
| Location Priority Type | Identifies the predefined types of priority that can be assigned from which the type may be set where:
High: action is required urgently.
Medium: action can occur within a reasonable period of time.
Low: action can occur when convenient. |
|
ScheduledFrequency |
P_SINGLEVALUE
/
IfcTimeMeasure
|
| Scheduled Frequency | The period of time between expected instantiations of a work order that may have been predefined. |
|