6.5.4.5 Pset_ProjectOrderMaintenanceWorkOrder

PSET_TYPEDRIVENOVERRIDE / IfcProjectOrder / MAINTENANCEWORKORDER

Natural language names
Project Order Maintenance Work Order
Properties

buildingSMART Data Dictionary

PSD-XML

NameTypeDescription
ProductDescription P_SINGLEVALUE / IfcText
Product DescriptionA textual description of the products that require the work.
WorkTypeRequested P_SINGLEVALUE / IfcText
Work Type RequestedWork type requested in circumstances where there are categorizations of types of work task. It could be used to identify a remedial task, minor work task, electrical task etc.
ContractualType P_SINGLEVALUE / IfcText
Contractual TypeThe contractual type of the work.
IfNotAccomplished P_SINGLEVALUE / IfcText
If Not AccomplishedComments if the job is not accomplished.
MaintenaceType P_ENUMERATEDVALUE / IfcLabel / PEnum_MaintenanceType
Maintenace TypeIdentifies the predefined types of maintenance that can be done from which the type that generates the maintenance work order may be set where: ConditionBased: generated as a result of the condition of an asset or artefact being less than a determined value. Corrective: generated as a result of an immediate and urgent need for maintenance action. PlannedCorrective: generated as a result of immediate corrective action being needed but with sufficient time available for the work order to be included in maintenance planning. Scheduled: generated as a result of a fixed, periodic maintenance requirement.
FaultPriorityType P_ENUMERATEDVALUE / IfcLabel / PEnum_PriorityType
Fault Priority TypeIdentifies the predefined types of priority that can be assigned from which the type may be set where: High: action is required urgently. Medium: action can occur within a reasonable period of time. Low: action can occur when convenient.
LocationPriorityType P_ENUMERATEDVALUE / IfcLabel / PEnum_PriorityType
Location Priority TypeIdentifies the predefined types of priority that can be assigned from which the type may be set where: High: action is required urgently. Medium: action can occur within a reasonable period of time. Low: action can occur when convenient.
ScheduledFrequency P_SINGLEVALUE / IfcTimeMeasure
Scheduled FrequencyThe period of time between expected instantiations of a work order that may have been predefined.

Link to this page  Link to this page